Violation Detail
Standard Cited: 19100269 A03 I C Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1204127.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/29/2017 2
Initial Penalty: $6,926.00
Current Penalty: $6,926.00
Issuance Date: 06/19/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A;R
Gravity: 5
Report ID: 0627500
Contest Date:
Final Order: 08/01/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 06/19/2017 | $6,926.00 | 06/29/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(a)(3)(i)(C): Before work begins, the host employer did not inform contract employers the information about the design and operation of the host employer's installation. At the substation: On or about January 19, 2017, the host employer, BP Wind Energy, did not inform the contract employer, JW Powerline, about the design and operation of the host employer's installation. This condition exposed the contract employees to electrical shock hazards.