Violation Detail
Standard Cited: 19100134 I08 Respiratory Protection.
Inspection Nr: 1194961.015
Citation: 01002
Citation Type: Serious
Abatement Date: 06/19/2017 2
Initial Penalty: $11,408.00
Current Penalty: $11,408.00
Issuance Date: 05/31/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0627500
Contest Date: 06/19/2017
Final Order: 08/15/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/15/2018 | $11,408.00 | 06/19/2017 | Serious | |
| Penalty | C: Contested | 06/19/2017 | $11,408.00 | 06/19/2017 | Serious | |
| Penalty | Z: Issued | 05/31/2017 | $11,408.00 | 06/19/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.134(i)(8): Breathing air couplings were not incompatible with other gas systems to prevent inadvertent servicing of air line respirators with non-respirable gases or oxygen: Refinery worksite/Marketing Terminal Area: On or about December 01, 2016, the employer did not ensure breathing air couplings were incompatible with other gas systems at Tank #523. This condition exposed an employee(s) to health hazards.
Translate