Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1190719.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/31/2017 2
Initial Penalty: $12,675.00
Current Penalty: $8,238.00
Issuance Date: 03/03/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 03/22/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/22/2017 | $8,238.00 | 03/31/2017 | Serious | |
Penalty | Z: Issued | 03/03/2017 | $12,675.00 | 03/14/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment: a. On or about November 14, 2016, the employer did not ensure that employees utilized energy control procedures to control hazardous energy prior to cleaning the Line 4 Potato Hopper. An employee received a partial finger amputation while cleaning the Line 4 Potato Hopper in that the equipment was not properly deenergized.