Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1185526.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 04/04/2017 2
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 03/09/2017
Nr Instances: 2
Nr Exposed: 15
Related Event Code (REC): A
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 03/27/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/27/2017 | $12,675.00 | 04/04/2017 | Serious | |
| Penalty | Z: Issued | 03/09/2017 | $12,675.00 | 04/04/2017 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.416(a)(3): Before work began the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit. Nor did the employer post and maintain proper warning signs and advise employee(s) of the power circuit as required: a) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, substation S side of the 480 volt switchgear was energized and the employer failed to assess the substation T side of the switchgear to determine if exposed bus bars were energized. Employees working on and near the substation T side of the switchgear were exposed to electrocution hazards. b) Building I2, Mezzanine Level; Switchgear S&T - On or about October 19, 2016 and times prior thereto, the employer failed to post and maintain proper warning signs and instruct each employee in the recognition and avoidance of unsafe conditions while working on and near the partially complete and energized switchgear exposing the employees to electrocution hazards. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.