Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1157203.015
Citation: 02001
Citation Type: Other
Abatement Date: 02/15/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/18/2016
Nr Instances: 1
Nr Exposed: 60
Related Event Code (REC):
Gravity:
Report ID: 0521700
Contest Date:
Final Order: 11/21/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/21/2016 | $0.00 | 02/15/2017 | Other | |
| Penalty | Z: Issued | 10/18/2016 | $0.00 | 12/06/2016 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection: a. On or about June 23, 2016 - entire facility, periodic inspections of the lockout procedures did not contain the identification of the machine, inspection date, or the employees included performing the lockout procedures.