Violation Detail
Standard Cited: 19260960 C01 III B
Inspection Nr: 1155007.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 11/14/2016 2
Initial Penalty: $12,471.00
Current Penalty: $12,471.00
Issuance Date: 10/27/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 11/23/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/23/2016 | $12,471.00 | 11/14/2016 | Serious | |
| Penalty | Z: Issued | 10/27/2016 | $12,471.00 | 11/14/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.960(c)(1)(iii)(B): The energized part was not insulated from the employee and from any other conductive object at a different potential: Worksite located at E 36th St N and N Columbia Ave. Tulsa, OK 74110. On or about June 13, 2016, the employer did not ensure that energized parts or conductive objects were insulated from the employee working on the power distribution line. The employees were exposed to the hazard of electrical shock and electrocution.