Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 115085615
Citation: 01002
Citation Type: Serious
Abatement Date: 04/24/1998 X
Initial Penalty: $2,000.00
Current Penalty: $50.00
Issuance Date: 03/10/1998
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC): A
Gravity:
Report ID: 0751910
Contest Date:
Final Order:
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/25/1998 | $50.00 | 04/24/1998 | Serious | |
| Penalty | Z: Issued | 03/10/1998 | $2,000.00 | 04/24/1998 | Serious |
Translate