Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1136905.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 10/18/2016
Initial Penalty: $12,471.00
Current Penalty: $0.00
Issuance Date: 09/28/2016
Nr Instances: 1
Nr Exposed: 40
Related Event Code (REC): A
Gravity: 10
Report ID: 0418200
Contest Date: 10/26/2016
Final Order: 08/14/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 08/14/2017 | $0.00 | 10/18/2016 | Serious | |
| Penalty | C: Contested | 11/02/2016 | $12,471.00 | 10/18/2016 | Serious | |
| Penalty | Z: Issued | 09/28/2016 | $12,471.00 | 10/18/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergization of the machine or equipment had been accomplished: a) Plant 15; On April 2, 2016 the employer failed to ensure that authorized employees verified that deenergization of the machine had been accomplished prior to replacing the tension roller on the N1A Nip Assembly.