Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1118344.015
Citation: 01004A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,900.00
Current Penalty: $3,430.00
Issuance Date: 04/20/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 05/18/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/18/2016 | $3,430.00 | Serious | ||
| Penalty | Z: Issued | 04/20/2016 | $4,900.00 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): On or about January 12, 2016, Pioneer Oil Company, Inc. had an employee exposed to moving parts and ingoing pinch points due to four unguarded pulleys used to operate the pump jack and associated fan, on pump jack, Shore# T-5.
Translate