Violation Detail
Standard Cited: 19100219 B01 Mechanical power-transmission apparatus.
Inspection Nr: 1118344.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,900.00
Current Penalty: $3,430.00
Issuance Date: 04/20/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 05/18/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/18/2016 | $3,430.00 | Serious | ||
| Penalty | Z: Issued | 04/20/2016 | $4,900.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv)(a): On or about January 12, 2016, Pioneer Oil Company, Inc. had an employee exposed to two unguarded flywheels on a pump jack, Shore # T-5.
Translate