Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1117717.015
Citation: 01001
Citation Type: Other
Abatement Date: 01/15/2017 2
Initial Penalty: $7,000.00
Current Penalty: $1,000.00
Issuance Date: 07/05/2016
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC): A
Gravity:
Report ID: 0626300
Contest Date: 07/28/2016
Final Order: 01/09/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/09/2017 | $1,000.00 | 01/15/2017 | Other | |
| Penalty | C: Contested | 08/02/2016 | $7,000.00 | 07/15/2016 | Serious | |
| Penalty | Z: Issued | 07/05/2016 | $7,000.00 | 07/15/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(D): Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. The employer did not ensure that specific requirements for testing the Sky Track to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures were followed.