Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 111319.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 04/24/2012 7
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 04/10/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 05/01/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2012 | $0.00 | 04/24/2012 | Serious | |
| Penalty | Z: Issued | 04/10/2012 | $7,000.00 | 04/24/2012 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): (a) The attempted retreival of the pipe pigging device from the termination catch point resulted in the violent release of hazardous pneumatic energy, in-that the residual pipe air pressure was not verified to be isolated to zero (0 psi), exposing the employee(s) to a struck by hazard.
Translate