Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 111319.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 04/24/2012 7
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/10/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 05/01/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2012 | $7,000.00 | 04/24/2012 | Serious | |
| Penalty | Z: Issued | 04/10/2012 | $7,000.00 | 04/24/2012 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) No procedure was developed for pigging processes performed on but not limited to loadout vessel piping, conche vessel piping and jumbo vessel piping; to ensure that hazardous pneumatic pressure was isolated prior to installing pigging device and prior to removing device from termination point.