Violation Detail
Standard Cited: 19100179 J04 III Overhead and gantry cranes.
Inspection Nr: 1105040.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $5,000.00
Issuance Date: 04/29/2016
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 05/19/2016
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 05/19/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/19/2016 | $5,000.00 | 05/19/2016 | Serious | |
Penalty | Z: Issued | 04/29/2016 | $7,000.00 | 05/19/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.179(j)(4)(iii): Standby crane(s) were not inspected at least semi-annually in accordance with the requirements of 1910.179(j)(2) and 1910.179(m)(2)(a): On or about November 10, 2015, The employer did not ensure their overhead cranes received semi-annual inspection. The P&H 10 ton overhead crane and the Wright 10 ton overhead crane were available for use as standby cranes for changing large motors, adding steel balls to the ball mills and adding oil to the gear boxes.