Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1105040.015
Citation: 01001
Citation Type: Serious
Abatement Date: 05/19/2016 2
Initial Penalty: $5,000.00
Current Penalty: $3,000.00
Issuance Date: 04/29/2016
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC): C
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 05/19/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/19/2016 | $3,000.00 | 05/19/2016 | Serious | |
Penalty | Z: Issued | 04/29/2016 | $5,000.00 | 05/19/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2): Floor(s) of workroom(s) were not maintained in a clean and, so far as possible, a dry condition: On or about November 10, 2015, there was an elevated walkway approximately 40 feet long on the second level at the side of the number 1 rotating ball mill. The elevated walking/working surface and surrounding floor area were wet and slippery from the pulverized cement powder/dust and the rain water that was coming through the roof.