Violation Detail
Standard Cited: 19261203 H04 I
Inspection Nr: 1102221.015
Citation: 01005D
Citation Type: Serious
Abatement Date: 05/05/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/11/2016
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 05/04/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/04/2016 | $0.00 | 05/05/2016 | Serious | |
| Penalty | Z: Issued | 04/11/2016 | $0.00 | 05/05/2016 | Serious |
Text For Citation: 01 Item/Group: 005D Hazard:
29 CFR 1926.1203(h(4)(i): The controlling contractor and entry employer(s) did not coordinate entry operations when more than one entity performs permit space entry at the same time: On or about October 20, 2015, employees entered a confined space between the post aeration building and the diversion structure and the employer and controlling contractor did not coordinate entry operations when more than one entity performs permit space entry at the same time.
Translate