Violation Detail
Standard Cited: 19260757 D02 III Open web steel joists.
This violation item has been deleted.
Inspection Nr: 1090285.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 03/10/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/02/2016
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0111400
Contest Date: 03/28/2016
Final Order: 05/05/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/05/2017 | $0.00 | 03/10/2016 | Serious | |
| Penalty | C: Contested | 03/31/2016 | $0.00 | 03/10/2016 | Serious | |
| Penalty | Z: Issued | 03/02/2016 | $0.00 | 03/10/2016 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.757(d)(2)(iii): Hoisting cables were released before two rows of bolted diagonal erection bridging, located near the third points of the joists, were installed on steel joists more than 60 feet in length. Jobsite: Bays between column lines 4 and 5. Hoisting cables were released before two rows of diagonal erection bridging were installed at the third points of the joists. For many joists, just one row of diagonal erection bridging was installed near the mid-point of the joists. For one joist, no diagonal erection bridging had been installed.