Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 108985.015
Citation: 01001
Citation Type: Willful
Abatement Date: 09/30/2013 2
Initial Penalty: $70,000.00
Current Penalty: $70,000.00
Issuance Date: 04/26/2012
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC): A
Gravity: 10
Report ID: 0830300
Contest Date: 05/21/2012
Final Order: 10/07/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/07/2013 | $70,000.00 | 09/30/2013 | Willful | |
| Penalty | C: Contested | 05/23/2012 | $70,000.00 | 05/11/2012 | Willful | |
| Penalty | Z: Issued | 04/26/2012 | $70,000.00 | 05/11/2012 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Adams Thermal Systems did not develop, document, or provide the procedures required to control potentially hazardous energy for their employees who were engaged in activities covered by this section: (a) The company did not develop and implement energy control procedures to protect employees performing maintenance and servicing work on the Matrix Core Machine at the Adams Thermal Systems plant in Canton, SD. To abate this violation, the employer must develop, document, and utilize a machine specific procedure to lock-out and tag-out the machine when employees are engaged in maintenance and servicing activities within the Matrix Core Machine to ensure that employees are not exposed to these hazards.