Violation Detail
Standard Cited: 19100178 Q07 Powered industrial trucks.
Inspection Nr: 1088724.015
Citation: 02001
Citation Type: Other
Abatement Date: 03/14/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/17/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 03/01/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/01/2016 | $0.00 | 03/14/2016 | Other | |
| Penalty | Z: Issued | 02/17/2016 | $0.00 | 03/14/2016 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.178(q)(7): Powered industrial truck(s) which were used on a round-the-clock basis were not examined for defects after each shift: a) Dayton Parts LLC1300 North Cameron Street warehouse - The employer is using the Hubtex side load forklift on a continuous basis and did not ensure that each shift inspect the power industrial equipment before the equipment is going to be used, on or about August 31, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement
Translate