Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 108749.015
Citation: 01006
Citation Type: Serious
Abatement Date: 06/02/2012 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 05/03/2012
Nr Instances:
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 05/24/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/24/2012 | $7,000.00 | 06/02/2012 | Serious | |
| Penalty | Z: Issued | 05/03/2012 | $7,000.00 | 06/02/2012 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): a) On 11/08/11, the BMD Group III Transfer Arms were not de-energized while an employee was working on the BMD Group II Mold Separation Clamps. The BMD Group III Transfer Arms move above the BMD Group II Mold Separation Clamps. ABATEMENT DOCUMENTATION AND ABATEMENT CERTIFICATION REQUIRED.