Violation Detail
Standard Cited: 19100147 F01 The control of hazardous energy (lockout/tagout).
Inspection Nr: 108749.015
Citation: 01004C
Citation Type: Serious
Abatement Date: 08/01/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/03/2012
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 05/24/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/24/2012 | $0.00 | 08/01/2012 | Serious | |
| Penalty | Z: Issued | 05/03/2012 | $0.00 | 06/02/2012 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.147(f)(1): When lockout or tagout devices temporarily were removed from the energy isolating device and the machine or equipment was energized to test or position the machine, equipment or component thereof, the sequence of actions in 29 CFR 1910.147(f)(1)(i) through (v) were not followed: (a) The company had not implemented procedures to provide employee protection while testing or positioning energized machines, equipment or components after energy controls are temporarily removed. On 11/08/11, a BMD Operator/Mechanic entered the BMD Mold Separation Area when the BMD Group II Separation Clamps were in Manual Operation and the Group III Transfer Arms were in Automatic Operation. ABATEMENT DOCUMENTATION AND ABATEMENT CERTIFICATION REQUIRED.