Violation Detail
Standard Cited: 19100023 E01 Ladders.
Inspection Nr: 108455.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/11/2012 2
Initial Penalty: $4,200.00
Current Penalty: $2,690.00
Issuance Date: 03/21/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 04/06/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/06/2012 | $2,690.00 | 04/11/2012 | Serious | |
| Penalty | Z: Issued | 03/21/2012 | $4,200.00 | 04/11/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.23(e)(1): A standard railing with a vertical height of 42 inches nominal from upper surface of top rail to floor, platform, runway, or ramp level was not provided. a) North Stairwell- The employer failed to ensure employees were provided with a standard railing that was at least 42 inches high vertically to provide protection from the open light well adjacent to the staircase. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Translate