Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1080254.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 02/12/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/19/2016
Nr Instances: 4
Nr Exposed: 5
Related Event Code (REC): A
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 02/10/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/10/2016 | $0.00 | 02/12/2016 | Serious | |
| Penalty | Z: Issued | 01/19/2016 | $0.00 | 02/12/2016 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Colorado Timber Resources, LLC at 210 County Road 21, Parshall, CO 80468: On or before July 24, 2015, the employer did not conduct annual periodic inspections of the energy control procedures at least annually to ensure the LOTO procedures were being followed. The lack of inspections for LOTO procedures applies to the following equipment: 1) the Cut Up and Saw Mill line, including such equipment as the cut-off saw, the log and waste conveyor, the debarker, the in-feed to the Scragg, the Scragg and vertical edger, the rough board stacker the chipper system, the resaw system, the board edger system, and the air compressor; and 2) the Planer line, including such equipment as the breakdown hoist, the trimmer system, the planer in-feed, the planer, the grading system, and the finished board stacker. Conditions exposed employees to caught in-between, amputation and electrical hazards. Abatement note: 29 CFR 1910.147(c)(6)(ii) provides that the employer shall certify that the periodic inspection has been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of inspection, the employees included in the inspection, and the person performing the inspection.