Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1080159.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,000.00
Current Penalty: $5,250.00
Issuance Date: 11/06/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order: 12/02/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/02/2015 | $5,250.00 | Serious | ||
Penalty | Z: Issued | 11/06/2015 | $7,000.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): A) Small roller area, on or about July 14, 2015 employees used a Birmingham power roller machine that did not have a trip wire or bar across the front of the in-running nip point area, exposing employees to an in-running nip point hazard.