Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1079709.015
Citation: 01001
Citation Type: Serious
Abatement Date: 01/05/2016 2
Initial Penalty: $6,300.00
Current Penalty: $5,040.00
Issuance Date: 12/22/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0215000
Contest Date:
Final Order: 01/22/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/22/2016 | $5,040.00 | 01/05/2016 | Serious | |
| Penalty | Z: Issued | 12/22/2015 | $6,300.00 | 01/05/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means. Site: WTC Tower 3 New York, NY On or about 7/22/15 a) Employees worked on live panels without de-energizing and grounding the area being worked on. They were not protected by guarding, by insulation or other means.
Translate