Violation Detail
Standard Cited: 19100146 E01 Permit-required confined spaces
Inspection Nr: 1075789.015
Citation: 01002
Citation Type: Other
Abatement Date: 11/10/2015 2
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 11/04/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity:
Report ID: 0626700
Contest Date:
Final Order: 12/02/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/02/2015 | $5,000.00 | 11/10/2015 | Other | |
| Penalty | Z: Issued | 11/04/2015 | $5,000.00 | 11/10/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.146(e)(1): Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit: (a) On or about July 6, 2015, employees performing rescue/recovery operations in railcar #TILX 261393, a permit-required confined space, did not complete an entry permit prior to entry.
Translate