Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
Inspection Nr: 1069965.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $1,700.00
Current Penalty: $1,190.00
Issuance Date: 06/22/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0111100
Contest Date:
Final Order: 07/09/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/09/2015 | $1,190.00 | Serious | ||
| Penalty | Z: Issued | 06/22/2015 | $1,700.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.251(e)(8)(iii): Synthetic web slings with snags, punctures, tears or cuts were not immediately removed from service: Curb Excavation - The five foot synthetic web sling was torn and cut.
Translate