Violation Detail
Standard Cited: 19100218 A02 II Forging machines.
Inspection Nr: 106940.015
Citation: 02001
Citation Type: Willful
Abatement Date: 04/20/2012 2
Initial Penalty: $28,000.00
Current Penalty: $28,000.00
Issuance Date: 03/21/2012
Nr Instances: 1
Nr Exposed: 11
Related Event Code (REC): C
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 04/05/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/05/2012 | $28,000.00 | 04/20/2012 | Willful | |
| Penalty | Z: Issued | 03/21/2012 | $28,000.00 | 04/20/2012 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.218(a)(2)(ii): There was no scheduling and recording of inspections of guards and point of operation protection devices at frequent and regular intervals for forging machine(s): On or about September 22, 2011, the employer did not perform and record inspections of guards and point of operation protection devices on forging machines, including the guards on foot pedals for hammers and presses. On or about September 22, 2011, the employer did not perform and record inspections of guards and point of operation devices on forging machines, including the guards on foot pedals for hammers and presses. The foot pedal on Hammer #9 was not effectively protected from unintended operation. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Translate