Violation Detail
Standard Cited: 19261417 C01
This violation item has been deleted.
Inspection Nr: 1060023.015
Citation: 01003
Citation Type: Serious
Abatement Date: 11/13/2015
Initial Penalty: $5,500.00
Current Penalty: $0.00
Issuance Date: 10/26/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 5
Report ID: 0521400
Contest Date: 11/04/2015
Final Order: 03/24/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | D: Govt Dismissed | 03/24/2016 | $0.00 | 11/13/2015 | Serious | |
| Penalty | C: Contested | 11/25/2015 | $5,500.00 | 11/13/2015 | Serious | |
| Penalty | Z: Issued | 10/26/2015 | $5,500.00 | 11/13/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.1417(c)(1): The procedures applicable to the operation of the equipment, including rated capacities (load charts), recommended operating speeds, special hazard warnings, instructions, and operator's manual, were not readily available in the cab at all times for use by the operator. On or about April 30, 2015, R. J. Corman Railroad Construction, LLC did not make readily available the manufacturer's operator's manual for use by the operator. The operator's manual provides information for the safe operation of the crane. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).