Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1057391.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 10/21/2015
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0214500
Contest Date: 12/07/2015
Final Order: 06/03/2016
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/03/2016 | $4,900.00 | Serious | ||
| Penalty | C: Contested | 12/09/2015 | $7,000.00 | Serious | ||
| Penalty | Z: Issued | 10/21/2015 | $7,000.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. a) Exterior Building Wall: Employees were exposed to a struck by hazard from a concrete wall collapse. Prior to demolition activities, an engineering survey by a competent person to determine structural conditions and possibility of an unplanned collapse was not performed. On 4/22/2015, an employee sustained fatal injuries from a cut masonry wall that collapsed during demolition activities.