Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1043963.015
Citation: 01001
Citation Type: Other
Abatement Date: 03/11/2015 2
Initial Penalty: $1,800.00
Current Penalty: $0.00
Issuance Date: 03/05/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0111100
Contest Date:
Final Order: 03/19/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/19/2015 | $0.00 | 03/11/2015 | Other | |
| Penalty | Z: Issued | 03/05/2015 | $1,800.00 | 03/11/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: Job Site - An employee was not protected from electric shock whenever that employee turned the breakers on/off in circuit breaker panel L as one of the breakers in the panel was missing.
Translate