Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1043543.015
Citation: 01007
Citation Type: Serious
Abatement Date: 09/17/2015 2
Initial Penalty: $3,000.00
Current Penalty: $1,800.00
Issuance Date: 09/02/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0625400
Contest Date:
Final Order: 09/23/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/23/2015 | $1,800.00 | 09/17/2015 | Serious | |
Penalty | Z: Issued | 09/02/2015 | $3,000.00 | 09/17/2015 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: On or about March 2, 2015, the employer did not conduct and annual inspection of the energy control program.