Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1043543.015
Citation: 01003
Citation Type: Other
Abatement Date: 09/07/2015 2
Initial Penalty: $3,000.00
Current Penalty: $1,800.00
Issuance Date: 09/02/2015
Nr Instances: 4
Nr Exposed: 30
Related Event Code (REC):
Gravity:
Report ID: 0625400
Contest Date:
Final Order: 09/23/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/23/2015 | $1,800.00 | 09/07/2015 | Other | |
Penalty | Z: Issued | 09/02/2015 | $3,000.00 | 09/07/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.22(a)(2): The floor of every workroom shall be maintained in a clean and, so far as possible, a dry condition. Where wet processes are used, drainage shall be maintained, and false floors, platforms, mats, or other dry standing places should be provided where practicable. On or about March 2, 2015, the facility was not kept as clean and orderly as the nature of the work allowed. a. Finish department, excessive water on the floor. There was a buildup of electrical scrap material off to the side and in the walkway. Employees exposed to a fall and slip hazard. b. Ceiling area, there was a buildup of construction debris and around the radial arm saw there was an excessive buildup of scrap materials that the employee was walking over. Employee was exposed to a fall hazard. c. Floor department, buildup of construction material/debris. Employees exposed to a fall hazard.