Violation Detail
Standard Cited: 19260404 F06 Wiring design and protection.
Inspection Nr: 1038189.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/05/2015 2
Initial Penalty: $4,900.00
Current Penalty: $3,430.00
Issuance Date: 02/25/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 03/20/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/20/2015 | $3,430.00 | 03/05/2015 | Serious | |
| Penalty | Z: Issued | 02/25/2015 | $4,900.00 | 03/05/2015 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: Pineland Farms - The grounding pin on the yellow extension cord on the aerial lift was missing.