Violation Detail
Standard Cited: 19100333 C03 Selection and use of work practices
Inspection Nr: 102760071
Citation: 01001
Citation Type: Serious
Abatement Date: 04/16/1999 X
Initial Penalty: $3,000.00
Current Penalty: $1,500.00
Issuance Date: 01/08/1999
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0830300
Contest Date: 01/22/1999
Final Order: 03/29/1999
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/29/1999 | $1,500.00 | 04/16/1999 | Serious | |
| Penalty | Z: Issued | 01/08/1999 | $3,000.00 | 01/12/1999 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: ELECTRIC
29 CFR 1910.333(c)(3): When work was to be performed near overhead lines, the lines were not de-energized and grounded, nor were other protective measures provided before work was started: (a) On or about 12/15/98 for an employee working from a boom supported elevating work platform and exposed to the potential for serious injury or death created by contact with a 7200 volt overhead power line. Abatement Note: Abatement certification and documentation are required for this item (see enclosed "Sample Abatement Certification Letter").tion