Violation Detail
Standard Cited: 19100254 D09 III Arc welding and cutting.
Inspection Nr: 1019505.015
Citation: 01004
Citation Type: Serious
Abatement Date: 02/28/2015 2
Initial Penalty: $4,200.00
Current Penalty: $2,520.00
Issuance Date: 02/18/2015
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0625500
Contest Date:
Final Order: 02/26/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/26/2015 | $2,520.00 | 02/28/2015 | Serious | |
Penalty | Z: Issued | 02/18/2015 | $4,200.00 | 02/28/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replaced: a) MAIN PRODUCTION AREA, FAR LEFT: On or about January 21, 2015 employees were exposed to an electrical shock hazard from damaged electrical insulation on welding cables. b) MAIN PRODUCTION AREA, CENTER: On or about January 21, 2015 employees were exposed to an electrical shock hazard from damaged electrical insulation on welding cables.