Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1018907.015
Citation: 02001
Citation Type: Other
Abatement Date: 09/08/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/09/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 07/17/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | $0.00 | 09/08/2015 | Other | ||
| Penalty | I: Informal Settlement | 07/17/2015 | $0.00 | 08/11/2015 | Other | |
| Penalty | Z: Issued | 07/09/2015 | $0.00 | 08/11/2015 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Plant, Polishing Area - On or about 01/13/15 and at times prior thereto the two light fixtures (fluorescent tubes and coils) for the quality control of polished slabs out of the Breton Slab Polisher were powered by flexible cables installed in permanent service without the protection of conduits. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Translate