Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1018907.015
Citation: 01005
Citation Type: Serious
Abatement Date: 09/08/2015 2
Initial Penalty: $2,800.00
Current Penalty: $2,100.00
Issuance Date: 07/09/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 07/17/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | $2,100.00 | 09/08/2015 | Serious | ||
| Penalty | I: Informal Settlement | 07/17/2015 | $2,100.00 | 08/11/2015 | Serious | |
| Penalty | Z: Issued | 07/09/2015 | $2,800.00 | 08/11/2015 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts: a) Plant, VA Line - The area of the turnover/rollover machine was not guarded, exposing employees to crushes and amputations due to the sudden, unpredicted movement of the machine, and the presence of rotating parts and nip points. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Translate