Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1010281.015
Citation: 01009
Citation Type: Other
Abatement Date: 07/09/2015 2
Initial Penalty: $3,000.00
Current Penalty: $2,000.00
Issuance Date: 05/19/2015
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity:
Report ID: 0636900
Contest Date: 06/04/2015
Final Order: 11/06/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/06/2015 | $2,000.00 | 07/09/2015 | Other | |
Penalty | C: Contested | 06/04/2015 | $3,000.00 | 07/09/2015 | Serious | |
Penalty | Z: Issued | 05/19/2015 | $3,000.00 | 07/09/2015 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: Main Administration building, on or about November 25, 2014 and at times prior thereto, employees were exposed to electrical shock hazards while using office equipment that was plugged into electrical receptacles that were not grounded.