Violation Detail
Standard Cited: 19100269 Q02 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1006073.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 06/23/2017 2
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 04/13/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0316400
Contest Date: 05/06/2015
Final Order: 06/23/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 06/23/2017 | $0.00 | 06/23/2017 | Serious | |
| Penalty | C: Contested | 05/12/2015 | $7,000.00 | 05/07/2015 | Serious | |
| Penalty | Z: Issued | 04/13/2015 | $7,000.00 | 05/07/2015 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.269(q)(2)(i): The employer did not use the tension-stringing method, barriers, or other equivalent measures to minimize the possibility that conductors and cables being installed or removed would contact energized power lines or equipment. a.) Davis H. Elliot Company, Inc., 57 Goshorn Road, Cameron WV: On or about 11/04/14, the company did not employ the tension-stringing method, install insulating barriers, or use other equivalent methods to prevent the neutral line being strung along the ground from contacting a 7200 volt energized primary line. The neutral line contacted the energized line as it was pulled, under tension, through mountainous terrain. ABATEMENT DOCUMENTATION IS REQUIRED.