Violation Detail
Standard Cited: 19100269 L03 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1006073.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 06/23/2017 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/13/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0316400
Contest Date: 05/06/2015
Final Order: 06/23/2017
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 06/23/2017 | $7,000.00 | 06/23/2017 | Serious | |
| Penalty | C: Contested | 05/12/2015 | $7,000.00 | 05/07/2015 | Serious | |
| Penalty | Z: Issued | 04/13/2015 | $7,000.00 | 05/07/2015 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.269(l)(3)(iii): The employer did not ensure that no employee(s) approached or took conductive objects closer to exposed energized parts than the employers established minimum approach distance: a.) Davis H. Elliot Company, Inc., Goshorn Road Cameron WV: On or about 11/03/14, the employer did not ensure employees maintained the established minimum approach distance of 1'1" when a neutral line being pulled on the ground made contact with the energized 7200 volt primary line. ABATEMENT DOCUMENTATION IS REQUIRED.
Translate