Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1003564.015
Citation: 01002
Citation Type: Serious
Abatement Date: 03/05/2015 2
Initial Penalty: $4,900.00
Current Penalty: $4,900.00
Issuance Date: 02/23/2015
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 03/20/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 02/23/2015 | $4,900.00 | 03/05/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits and equipment were denergized: (a) On or about 10/24/2014 - 1027 Martin Street, Pell City, AL, safe procedures were not established for employees changing ballasts on a pylon.
Translate