Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1357199.015
Citation: 01007A
Citation Type: Serious
Abatement Date: 04/24/2019 2
Initial Penalty: $11,934.00
Current Penalty: $8,000.00
Issuance Date: 03/27/2019
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC):
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 04/22/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/22/2019 | $8,000.00 | 04/24/2019 | Serious | |
Penalty | Z: Issued | 03/27/2019 | $11,934.00 | 04/24/2019 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment. On or about October 31, 2018, and times prior thereto, The employer did not establish and implement written procedures to maintain the on-going integrity of the following process equipment: NGL Tank 1 and 2 Slop Tank A and B High Stage Compressor Low Stage Compressor Inlet Compressor Flare and Knockout Drums 32-803 Propane Economizer 32-802 Propane Accumulator 32-805 Propane Scrubber 21-603 Trim Reboiler 31-602 Blue Tower Nitrogen Regeneration Column V-100a Sweet Gas After Scrubber Pressure relief valves Process piping P-200 Amine Charge Pump A&B P-201 Amine Reboiler Pump A&B P-202 Reflux Pump P-300 Hot Oil Pump F-100 Inlet Filter Separator F-200 Amine Solids Filter F-300 Hot Oil Filter NGL Stabilizer Amine flash tank After Scrubber