Violation Detail
Standard Cited: 19100217 B13 Mechanical power presses.
Inspection Nr: 1228699.015
Citation: 01004A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,622.00
Current Penalty: $2,500.00
Issuance Date: 06/06/2017
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 07/24/2017
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 06/29/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/29/2017 | $2,500.00 | 07/24/2017 | Serious | |
| Penalty | Z: Issued | 06/06/2017 | $3,622.00 | 07/24/2017 | Serious |
Text For Citation: 01 Item/Group: 004A Hazard:
29 CFR 1910.217(b)(13): Control system(s) of mechanical power press(es) were not constructed so that a failure within the system would not prevent the normal stopping action from being applied to the press when required, but would prevent initiation of a successive stroke until the failure is corrected. (a) Location - Production: On or about 5/18/17, the employer failed to provide control reliability on the Minster 7 mechanical power press. (b) Location - Production: On or about 5/18/17, the employer failed to provide control reliability on the Minster 50-6.5-72 mechanical power press.