Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1273217.015
Citation: 01003
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $7,243.00
Current Penalty: $7,243.00
Issuance Date: 11/21/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity:
Report ID: 0214200
Contest Date:
Final Order: 12/27/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/27/2017 | $7,243.00 | Other | ||
| Penalty | Z: Issued | 11/21/2017 | $7,243.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used where attached to building surfaces Location: 720 Belleville Turnpike Kearny, NJ 07032-warehouse a) Employer utilized a temporary flexible extension cord as a permanent installation to power/charge electric scale pallet jack trucks thus exposing employees to a potential fire hazard at the loading docks; on or about 10/16/17.
Translate