Violation Detail
Standard Cited: 19100107 I05 Spray finishing using flammable and combustible materials.
This violation item has been deleted.
Inspection Nr: 1421123.015
Citation: 01002E
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/10/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/06/2020
Gravity: 10
Report ID: 0317300
Contest Date: 02/27/2020
Final Order: 07/09/2021
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/09/2021 | $0.00 | 03/06/2020 | Serious | |
Penalty | C: Contested | 02/28/2020 | $0.00 | 03/06/2020 | Serious | |
Penalty | Z: Issued | 02/10/2020 | $0.00 | 03/06/2020 | Serious |
Text For Citation: 01 Item/Group: 002E Hazard:
29 CFR 1910.107(i)(5): The handle of the spraying gun was not electrically connected to ground by a metallic connection and so constructed that the operator in normal operating position is in intimate electrical contact with the grounded handle: (a) Painting Area ("Paint Booth") - On or about August 12, 2019, the employer failed to protect employees from potential fire hazards, as an airless paint sprayer was not electrically connected to ground while spraying Category 3 flammable liquids, to include Hempadur Mastic epoxy paint.