Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 316081223
Citation: 01002
Citation Type: Serious
Abatement Status: I
Initial Penalty: $3,960.00
Current Penalty: $1,980.00
Issuance Date: 08/21/2012
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/24/2012
Gravity: 05
Report ID: 0418200
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/11/2012 | $1,980.00 | 08/24/2012 | Serious | |
| Penalty | Z: Issued | 08/21/2012 | $3,960.00 | 08/24/2012 | Serious |
Translate