Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 922631.015
Citation: 01001
Citation Type: Serious
Abatement Date: 1
Initial Penalty: $1,700.00
Current Penalty: $1,700.00
Issuance Date: 02/05/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0625700
Contest Date:
Final Order: 03/03/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/05/2014 | $1,700.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports. Duhon Blvd., Amelia, LA: On or about July 24, 2013, the employer did not ensure that the working platform of the scaffold was fully planked. Employee(s) were working from a plank measuring 12 x 12. There was a gap of 45 1/2 in. between the plank and the front uprights. Employee(s) were exposed to a fall hazard.