Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 311551303
Citation: 01001
Citation Type: Serious
Abatement Status: I
Initial Penalty: $825.00
Current Penalty: $618.75
Issuance Date: 03/12/2008
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/17/2008
Gravity: 01
Report ID: 0420600
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/04/2008 | $618.75 | 03/17/2008 | Serious | |
Penalty | Z: Issued | 03/12/2008 | $825.00 | 03/17/2008 | Serious |