Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 311303358
Citation: 01001
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $7,200.00
Current Penalty: $7,200.00
Issuance Date: 01/14/2008
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 08/27/2007
Gravity:
Report ID: 1055350
Contest Date: 02/01/2008
Final Order: 02/12/2009
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 02/12/2009 | $7,200.00 | 08/27/2007 | Repeat | |
| Penalty | Z: Issued | 01/14/2008 | $7,200.00 | 08/27/2007 | Repeat |